www.putinzenjering.com | We have completed the construction of an industrial facility “LEAR” in Novi Sad
2669
post-template-default,single,single-post,postid-2669,single-format-standard,qode-quick-links-1.0,ajax_fade,page_not_loaded,,qode_grid_1300,footer_responsive_adv,hide_top_bar_on_mobile_header,qode-content-sidebar-responsive,qode-child-theme-ver-1.0.0,qode-theme-ver-11.2,qode-theme-bridge,wpb-js-composer js-comp-ver-5.2.1,vc_responsive
 

We have completed the construction of an industrial facility “LEAR” in Novi Sad

We have completed the construction of an industrial facility “LEAR” in Novi Sad

Work on the construction of the industrial facility “Lear” in Novi Sad has been completed. The building has 24000m2, with a combined load-bearing structure of AB prefabricated pillars and steel roof racks.

No Comments

Post A Comment