www.putinzenjering.com | We have finished building the factory in Secanj
2070
post-template-default,single,single-post,postid-2070,single-format-standard,qode-quick-links-1.0,ajax_fade,page_not_loaded,,qode_grid_1300,footer_responsive_adv,hide_top_bar_on_mobile_header,qode-content-sidebar-responsive,qode-child-theme-ver-1.0.0,qode-theme-ver-11.2,qode-theme-bridge,wpb-js-composer js-comp-ver-5.2.1,vc_responsive
 

We have finished building the factory in Secanj

We have finished building the factory in Secanj

Works on the construction of a factory for cold processing of vegetables with a refrigerator in Sečanj have been completed. Installation of the reinforced concrete structure with a total area of about 8800m2 was completed on Sunday, August 14th. The works were smooth and the assembly was completed within the deadline.

No Comments

Post A Comment