![](https://putinzenjering.com/wp-content/uploads/2020/01/Untitled-1-1.jpg)
Successful assembly of the structure
Successfully completed installation of reinforced concrete structure on the construction site in Smederevo – PKC Wiring Systems on an area of 5,700.00 m2 + 3864.74 m2 under hollow slabs.
0 Likes