
Picasso – HENKEL Serbia
Our new engagement – installation of reinforced concrete structure on the facility of the factory for the production of capsules for machine dishwashing – Picasso within the factory HENKEL SERBIA. The characteristic of this installation is that the poles are mounted on PEIKKO anchors. Area: 1427,00 m2 and mezzanine construction 2397,00 m2.
0 Likes